FLIGHT PLAN MCC-H NOTES MISSION PAGE DAY / REV TIME DATE EDITION APOLLO 11 3-4 1 / TLC 03:00 - 04:00 JULY 1, 1969 FINAL MSC Form 29 (May 69) FLIGHT PLANNING BRANCH 1230 EDT 03:00 :10 :20 :30 :40 :50 04:00 M S F N WASTE STOWAGE VENT VLV - CLOSED PRESS CABIN TO 5.7 PSIA GDC ALIGN TO IMU VERIFY AND ACTIVATE RCS DAP R1=11103, R2=01111 CMP - INITIATE CM/LM PRESS EQUALIZATION POST DOCKING S-BAND HGA ANGLES = P Y DOCKING PHOTOGRAPHY GET = 03:15 LOAD DOCKING GIMBAL ANGLES CSM SEP PREPARATION CONFIGURE FOR EXTRACTION CHECK LM PRESS STABILIZATION REMOVE AND TEMP STOW TUNNEL HATCH CHECK DOCKING LATCHES VENT DOCKING PROBE CONNECT UMBILICALS - VERIFY PWR TO LM REINSTALL HATCH LM/CM ∆P VALVE - LM/CM ∆P VERIFY TUNNEL EQUALIZATION - CLOSED WASTE STOWAGE VENT VALVE - OPEN (FOR 8 HOURS) DAP LOAD FOR SEPARATION CSM, 0.5°DB, 2.0°/SEC, B/D ROLL, 4 JETS EL PHOTOS AS CONVENIENT DECISION TO END CM CABIN PURGE WILL BE MADE REAL TIME BASED ON LM LEAK RATE T&D MNVR +X 0.8 FPS AFTER 15 SEC, -X 0.3 FPS AUTO MNVR TO DOCKING ATT NULL TRANSLATION & RATES +X TO CLOST AT .25 TO .5 FPS CSM/SIV-B SEP START 16mm CAMERA STOP 16mm CAMERA DOCK GET = 03:25
Previous Page Next Page