FLIGHT PLAN CMP MISSION PAGE DAY / REV TIME DATE EDITION APOLLO 11 3-78 5 / 18-19 111:00 - 112:00 JULY 1, 1969 FINAL MSC Form 2189 (OT) (Nov 68) FLIGHT PLANNING BRANCH 0030 EDT 111:00 111:21 111:30 111:39 111:33 112:00 CDR LMP CSM LM MCC-H REV 19 M S F N M S F N REST PERIOD (4 HOURS) EAT PERIOD (1 HOUR) CO2 FILTER CHANGE NO. 9 (11 INTO A, STORE 9 IN A3) O2 FUEL CELL PURGE LMP UNSTOW AND DON OVERSHOES ATTACH OPS TO PLSS CDR UNSTOW AND DON OVERSHOES ATTACH OPS TO PLSS LMP DON PLSS UNSTOW AND CONNECT RCU VERIFY PLSS SWITCH AND VALVE POSITIONS PREPARE CDR PLSS FOR DONNING CDR DON PLSS UNSTOW AND CONNECT RCU VERIFY PLSS SWITCH AND VALVE POSITIONS PLSS/EXTRA VEHICULAR COMM SYSTEM ELECTRICAL CHECKOUT AUDIO SWITCHES CHECK ACTIVATE PLSS COMM SYSTEMS FINAL EVA EQUIPMENT PREP FOR EGRESS UNSTOW AND CONNECT OPS O2 HOSE AND ACTUATOR FINAL SYSTEMS PREP FOR EGRESS CONFIRM „GO“ FOR CABIN DEPRESS VERIFY C/B, VALVES AND O2/H2O QUANTITY GO/NO-GO