5  -  38  LM  ECS  BUDGET  GROUND  RULES  AND  ASSUMPTIONS  1.  Cabin  O2  leakage  rate  was  0.2  lb/hr  while  pressurized  2.  Metabolic  rates  were  varied  according  to  Volume  2  of  the  Spacecraft  Operational  Data  Book  3.  Metabolic  O2  consumed  was  (1.643  x  10-4  )  x  (metabolic  rate)  4.  LM  pressurization  requires  6.62  lb  of  O2  5.  Cabin  pressure  regulator  check  requires  2.65  lb  of  O2  6.  H2O  consumed  because  of  sublimator  cooling  was  total  heat  removed  divided  by  1040  (btu  per  lb)  of  H2O  7.  H2O  lost  due  to  urination  was  0.11  lb/hr  per  man  8.  Cabin  temperature  control  was  set  to  72°  F  9.  Average  glycol  fl  ow  rate  was  250  lb/hr  10.  Budget  was  performed  on  the  operational  trajectory  and  may  change  when  the  revision  1  is  analyzed.  TABLE  5-13  LM  ECS  Summary  (a)  Descent  Stage  Description  O2,  lb  H2O,  lb  Loaded  48.00  210.6  Unusable  3.40  16.4  Available  for  mission  44.60  194.2  Required  for  mission  26.17  142.4  Usable  remaining  in  tanks  18.43  51.8  (b)  Ascent  Stage  Loaded  4.86  85.00  Unusable  .74  4.20  Available  for  mission  4.12  80.80  Required  for  mission  1.95  45.48  Usable  remaining  in  tanks  2.17  35.32  
Purchased by unknown, nofirst nolast From: Scampersandbox (scampersandbox.tizrapublisher.com)
 
            































































































































































































































































































































































