5 - 7 TABLE 5-2 (CONT‘D) SM-RCS PROPELLANT BUDGET TIME (HR) EVENT S/C WT (LBS) S/C RCS USED (LBS) S/C RCS LEFT (LBS) S/C RCS LEFT (%) 78.2 79.2 80.0 80.0 80.0 80.1 80.1 80.1 80.1 80.2 80.4 82.2 82.3 82.3 82.3 82.3 84.2 94.4 94.5 REV 2 ATTITUDE HOLD P52 IMU ALIGN LOI 2 LPO CIRC MNVR TO BURN ATT ATTITUDE HOLD 0.5 DEG DB PGNCS B-D ULLAGE SPS BURN BUILD UP STEADY STATE BURN TAILOFF DAMP SHUTDOWN TRANSIENT REV 3 ATTITUDE HOLD REACQUIRE MSFN ROLL 0.2 DEG/SEC REV 4 ATTITUDE HOLD MNVR TO LDG SITE OBS ATT LDG SITE OBSERVATION REORIENT REACQUIRE MSFN MANEUVER TO SLEEP ATTITUDE 3 AXIS 0.2 DEG/SEC DAMP RATES REACQUIRE MSFN 72309. 72309. 72306. 72305. 72290. 72287. 71316. 71276. 71275. 71272. 71272. 71269. 71265. 71265. 71261. 71261. 71258. 71254. 71254. 3.0 .1 3.5 .8 15.1 .0 .2 .0 1.1 3.0 .1 3.0 3.5 .4 3.5 .2 3.5 3.5 .1 1036.6 1036.5 1033.0 1032.2 1017.1 1017.1 1017.0 1017.0 1015.9 1012.9 1012.8 1009.8 1006.3 1005.8 1002.3 1002.1 998.6 995.0 994.9 85. 85. 85. 85. 83. 83. 83. 83. 83. 83. 83. 83. 82. 82. 82. 82. 82. 82. 82.
Previous Page Next Page