APPENDIX 398 Padalka, Gennady, 33 Parazynski, Scott, 309, 310, 311, 313–314, 316, 320, 321, 322, 324–329 Parmitano, Luca, 244, 290, 355 Part Task Trainer simulator, 175, 176 Passive Thermal Control Systems (PTCSs), 192, 194–195 patch, mission, x–xi Patrick, Nick, 75, 78, 83, 84, 85 Payload Multiplexer/DeMultiplexers (Payload MDMs), 98–99, 273 payload operations director, xxvi Payload Operations Integration Control Center, Huntsville Alabama, xxvi, xxix Payload Orbital Replacement Unit Accommodation (POA), 256, 257 payload racks, 54, 57, 58 Peake, Tim, 33 Permanent Multipurpose Module (PMM), xviii, 38, 50, 72–73 Perrin, Phillippe, 263 Pettit, Donald, 114–115, 258, 274 phased array radars, debris tracking, 144 phasing portion of visiting vehicle mission, 241 phone calls, crews’ space-to-ground, 28 Photo-Voltaic Modules (PVMs), 159, 163, 164, 168–169 PhotoVoltaic Radiator (PVR), 202–203 PhotoVoltaic Thermal Control System (PVTCS), 198, 199, 201, 203, 205 pin kits for resolving electrical failures, 161 Pistol Grip Tool, 296 “pizza box” around ISS for close debris encounters, 145 Planning Product Change Request (PPCR), 11–12 planning the ISS, 2–17 components of mission plan, xxiii configuration management, 11–13 increment planning, 5–11 lessons learned, 14–17 long-range planning, 2–5 scheduling changes, 13–14 Plasma Contactor Units, 320 PLug-in-plan and UTilization Officer (PLUTO), xxv, 93, 216 plume impingement, 170 Pointing position of the ISS Position (Pointing), xxv pointing systems, 168–170 Beta Gimbal Assemblies, 111, 125, 163, 169–170 Solar Alpha Rotary Joints, 168–169. See also Solar Alpha Rotary Joints (SARJs) Portable Breathing Apparatus (PBA), 346, 347, 350 Portable Computer System (PCS), 93, 101–103, 111, 112–113, 216 Portable Fire Extinguisher (PFE), 346, 348 Positive Pressure Release Assembly (PPRA), 336 Positive Pressure Relief (PPR), 186, 217 postflight crew activities, 32 Post Increment Evaluation Report, 17 post-sleep time on ISS, 22–23 potable water, 340 Potable Water Dispenser (PWD), 344 Power and Data Grapple Fixture (PDGF), 254–255, 256, 257 power buses, 168 power channels cross-ties, 160 diagram of, 163 EPS design, 160 role in EPS, 159, 163 variations in output of, 161 power distribution, 166 power planning, 161 power system. See Electrical Power System (EPS) power tools, 270 prebreathe of oxygen prior to EVA depressurization, 298–299 Predetermined Debris Avoidance Maneuver (PDAM), 148, 149–151 Pre-Positioned Load (PPL), 105 presleep time for crew, 24 Pressure Control Assembly (PCA), 335–336 pressure level of fluid lines in TCS accumulator management, 197, 199–201 movement challenges, 363–365, 367–368 pressurized habitat modules assembly of, 38–41 internal cooling loops for, 205 in overall structure, 37 Pressurized Mating Adapter (PMA) modules movement of, xxi PMA-2, xv, xvi, 40, 271 PMA-3, 67, 69, 70, 71, 72, 73, 86, 271 Preventive Maintenance, 269 Primary Power System, 163–165 batteries, 165 Battery Charge/Discharge Units (BCDUs), 165 overview, 156–157 power channel cross-ties, 160 sequential shunt units (SSUs), 165 solar arrays, 163–165 Primary state, MDM, 100 primary structure components, 36–46. See also Integrated Truss System pressurized module assembly, 37, 38–41, 205 ready-to-latch requirement, 44–46 structural health, 42–43 privacy for crew during off-time, 24, 28 probability of collision (Pc), 145 Probability of No Penetration, 48 “probe-and-cone” docking system, Russian modules, 38 problem recognition, training for, 177 Product Water Tank, 344 Program Office, USOS, xv Progress supply vehicles attitude control from Russian Service Module, 120, 133 decrewing plan for, 213 docking system, 46, 235 loss of 44P and decrewing discussion, 210, 211, 214–215, 218–219 overview, xv, xvi, xviii propellant transport for reboost activities, 235, 236 Proximity Operations mode, 106 psychological support for crew daily routines, 24, 29 holidays and time off, 3–4, 27–28 privacy during off-time, 24, 28 public relations Obama’s call to crew, 82, 86 as role for crew and flight controllers, 29, 369 video live-streams to internet, 230–231 pump accumulator quantity, 178 pump and control valve package, 200 Pump and Flow Control Subassembly (PFCS), 197, 199, 203 Pump Module changing out, 354, 358–359, 360, 362–363, 368, 370–376 jettison option, 365 location of, 362 process schematic, 200 workings of, 199–201 Q Quick Disconnect (QD) problems, 360, 363–365, 367, 369, 370, 373–374 R Rack Power Switch, 346 racks, 54–58 Atmosphere Revitalization Rack, 338 avionics, 54, 57 crew support, 54 Fluids Integrated Rack (FIR), 58 installation process, xxii Moderate Temperature TCS, 57 Node 3 installation, 84–85 payload, 54, 57, 58 Sabatier rack, 337, 344 and stowage space, 54 Window Observation Rack Facility, 51 Radiator Beam Truss Structure, 203, 204 Radiator Return valve, 359, 364, 366 radiators coordination with solar arrays, 157 process schematic, 200 radiator panels, 192, 202 role in Thermal Control System, 196–197, 202–204 Thermal Radiator Rotary Joint (TRRJ), 187, 200, 204, 356, 357, 358 Trailing Thermal Control Radiator (TTCR), 202, 203, 205 Radio Frequency Group (RFG), 223 radio frequency spectrum, 223. See also RF (radio frequency) links
Purchased by unknown, nofirst nolast From: Scampersandbox (scampersandbox.tizrapublisher.com)